Friday, 10th March, 2017
At last the scaffolding around the main hall has been taken down, and should be gone by the time this appears. Work can now begin on excavating the front of the building for paving and landscaping.
Doors and Windows are expected any time soon. Still needs the roof of the admin block to be completed, so scaffolding still around that end. Plenty of insulation panels and covering material available so, provided the weather stays dry this should complete soon.
Inside, there is still a little blockwork to complete before they lay the heating manifolds.