Monday, 15th May, 2017
Called at the site last Friday to find all the cabins gone, took one shot of the car park as Peter was not on-site so I couldn't wander around. I was away all weekend so added that shot to today's pictures.
Called again today to find the car park being excavated in preparation for laying of tarmac. A mountain of rubble in the middle will need to be removed.
Paving along the side of the car park is in progress, but there appears to be a bit of a problem by the fire exit door - the level is quite high relative to the car park and the resulting slope looks dodgy.
The long gate for the car park has arrived; the substantial posts were being erected with lots of concrete. Will have to wait a few days before hanging the gate to allow the concrete to mature.